Installer profile
Affordable Solar
Yes, get a quote, and read the second paragraph before you decide which company you are actually quoting. The residential record is the strongest in our New Mexico research. Affordable Solar opened in Albuquerque in 1998 (its own FAQ says 1997, a discrepancy two government documents, PitchBook, BBB, and its homepage all resolve in favor of 1998). BBB rates it A+, has accredited it since November 5, 2008, and shows 0 complaints in the last 3 years. The warranty is published with numbers, which is rarer than it should be: a 10 year workmanship warranty, a 5 year performance guarantee, and 25 year equipment warranties from the manufacturers, with the company filing the claim and installing the replacement, per its own blog and a This Old House writeup. The FAQ says all installations are done by in house crews and that a service team is in house too; a City of Albuquerque document adds the honest qualifier that the company self performs with specialty subcontractors where needed. Scale is real: 140 full time Albuquerque workers at the end of 2020 per the city, 141 per the state, and the company claims 4,500 plus New Mexico residential systems at a pace of 500 plus a year.
Now the structure, because the name on the truck is not the name on the paperwork. The legal entity is Affordable Solar Installation, Inc., a subsidiary of Zia Energy Group, Inc. The utility scale division the company built in 2014 has operated independently as Gridworks since March 2022, and BBB still lists Gridworks, Inc. as an alternate name. PitchBook records the company as acquired or merged on January 1, 2021 with no buyer named on the page we read, and no press release naming that acquirer was found. Three unrelated companies share the name and were excluded from this research: an Oklahoma outfit at affordablesolar.io, a Florida acquisition target called Affordable Solar Solutions, and a Cayman Islands firm. What you would be hiring is the Albuquerque residential arm of a mostly commercial and utility scale EPC. Make sure the contract names Affordable Solar Installation, Inc.
The license is what holds the grade at C. New Mexico licenses through the Construction Industries Division. An official City of Albuquerque LEDA document states the company holds a New Mexico commercial contractor license with EE98, EL01, and GB98 classifications, names Blake Richards, Director of Construction, as the GB98 holder, and lists contractor licenses in New Mexico, Arizona, Utah, California, and Nevada. BBB says the company does possess required CID licensing, then flags that the dba Affordable Solar is not included in the licensing for Affordable Solar Installation, Inc. That is a registration formality flag from BBB, not a state action, and we are not treating it as one. The problem for our rubric is simpler: no license number is printed in any source we read, and the CID lookup is CAPTCHA gated and was not read. Two institutions vouching for a license is good evidence. It is not a registry read, and the cap applies. The only litigation found is a December 2016 patent suit by an Arizona competitor over a canopy design, dismissed on settlement October 13, 2017. Despite its size, the company is on neither 2026 Solar Power World list. Ask for the CID number, check it, and this grade has room to move.
The evidence
Founded 1998 per the City of Albuquerque LEDA document, the NM Economic Development Department LEDA document, PitchBook, BBB (Business Started 1/1/1998, incorporated 3/4/2010 as a corporation, file opened 3/9/2004), and the company homepage and about page. The company FAQ alone says 1997. Twenty eight years under the current name, with the utility scale division spun out as Gridworks in March 2022.
BBB shows 0 total complaints in the last 3 years and 0 closed in the last 12 months, with an A+ rating and accreditation since 11/5/2008. No Attorney General or regulator action was found; the NM AG solar releases name New Mexico Solar Group, Meraki Solar, Titan Solar, and Vivint Solar, not this company. The one court matter located is a patent infringement suit filed by Strategic Solar Energy LLC in December 2016 over a canopy design, dismissed on settlement by court order dated October 13, 2017, terms not public.
Neither Affordable Solar nor Gridworks appears in the 2026 Solar Power World national table (388 entries) or the 2026 New Mexico table (12 entries). Government documents establish headcount, 140 full time Albuquerque workers at end of 2020 per the city and 141 employees per the state, with 70 jobs added and $7.5M in industrial revenue bonds for the 3900 Singer Blvd site, but the install figures of 4,500 plus New Mexico residential systems and 500 plus per year are the company's own claims.
Source: Affordable Solar FAQ
A City of Albuquerque LEDA document states the company holds a New Mexico commercial contractor license with EE98, EL01, and GB98 classifications and names Blake Richards, Director of Construction, for the GB98. BBB states the company possesses required CID licensing but has not fully complied with state licensing requirements because the dba Affordable Solar is not included in the licensing for Affordable Solar Installation, Inc. No license number is printed in any source read and the CID lookup at public.psiexams.com is CAPTCHA gated and was not read, so this is institutional corroboration without a registry read, which caps the grade at C.
Source: City of Albuquerque LEDA document, Case 2021-8, Affordable Solar
The company blog states every system comes with a 5 year performance guarantee, a 10 year workmanship warranty from Affordable Solar, and 25 year equipment warranties from the component manufacturers. This Old House corroborates the same three terms and describes the workmanship coverage as wires, clips, conduits, and breakers during installation, with Affordable Solar filing equipment claims and installing the component free of charge. The durations do not appear on the company FAQ, so confirm them in the contract.
Source: Affordable Solar blog, maintaining your solar panel system
Company facts
| Legal entity | Affordable Solar Installation, Inc., a subsidiary of Zia Energy Group, Inc.; BBB alternate name Gridworks, Inc. |
| CID license classifications | EE98, EL01, GB98 per City of Albuquerque LEDA document; license number not printed in any source read; BBB flags the dba not being included in the licensing; state registry not read |
| Other state licenses (company statement in city document) | Contractor licenses in NM, AZ, UT, CA, and NV |
| Business started | January 1, 1998 (BBB); founded 1998 per two government documents; company FAQ says 1997 |
| Address | 3900 Singer Blvd NE, Albuquerque, NM 87109 |
| Management | Ryan Centerwall, President and CEO; David Hughes, VP; Wayne Stansfield, GM; Blake Richards, Director of Construction (GB98) |
| BBB rating | A+, accredited since November 5, 2008; 0 complaints in the last 3 years |
| Headcount | 140 to 141 employees per 2020 to 2021 government documents; 150 plus per the about page; BBB shows 27 |
| Workmanship warranty | 10 year workmanship, 5 year performance guarantee, 25 year equipment (company blog, corroborated by This Old House) |
| Crew claim | In house install crews and in house service team per FAQ; self performs with specialty subcontractors where needed per city document |
| Stated service area | Residential work throughout New Mexico |
| Corporate history | Utility scale division operating independently as Gridworks since March 2022; PitchBook records an acquisition or merger dated January 1, 2021, buyer not named |
Data pulled September 25, 2026 from BBB profile, Affordable Solar, BBB complaints page, Affordable Solar, City of Albuquerque LEDA document, NM EDD LEDA document, NM EDD board meeting summary, PitchBook profile, Affordable Solar FAQ, Affordable Solar warranty blog post, This Old House review, Duane Morris patent settlement note and Solar Power World 2026 New Mexico list.
How to read this
This is the rare C that comes from a rule rather than a record. Every criterion we could check came back clean or better; the one we could not check is the state license register, and our scale does not hand out a B without it. If you confirm an active CID number for Affordable Solar Installation, Inc. yourself, weigh this company as you would a B. Also confirm which entity signs your contract, since the family includes Zia Energy Group and Gridworks, and get the 10 year workmanship term written into the agreement rather than trusting a blog post. Our full rubric, including how our own installation business gets graded on the same scale, is on the methodology page. We are a solar installer and we partner with other solar companies. Grading is structurally separated from revenue; see disclosures.