AMECO is the most substantial operator of the three Southern California companies we graded this week, and also the one where the marketing needs the most translation. Start with the 1974 claim. The brand genuinely dates to 1974 and BBB confirms that business start date, but the company you would hire today is AMECO Solar LLC, CSLB license 1053172, issued May 6, 2019, incorporated January 24, 2019, with BBB recording new ownership as of May 6, 2019. The founder-era corporation, AMECO Solar Inc under Patrick Redgate's license 483280, was reissued to another entity in 2009 and dissolved in 2021. The site says "over 50 years" in one place and "nearly 40 years of experience" in another. Neither describes the current LLC, which is seven years old.
The current record is solid where it counts. License 1053172 is active with B General Building and C-10 Electrical (no C-46 Solar, which B plus C-10 does not require for this work), a $25,000 contractor bond, a $100,000 LLC employee bond, $1,000,000 in liability coverage, and workers comp through April 2027. AMECO is the only company in this batch with independently verified volume: Solar Power World 2026 ranks it 227th nationally, 49th in California, and 74th on the installers list at 4,479.97 kW installed in 2025. One caution from the same license page: the workers comp policy lists only sales and clerical class codes, no field installation codes, so ask directly who performs the physical work. A sibling entity, AMECO Builders Inc, was licensed in December 2025 at the same address with the same qualifiers, who also run NRG Clean Power.
The complaint file is where the C gets earned. BBB rates AMECO A and has accredited it since 2000, but shows 12 complaints in three years with 9 closed in the last 12 months, and the pattern is consistent: warranty service delays on a SolarEdge inverter for a $40,000 system, battery support delays, a $350 fee charged for an in-warranty microinverter and later refunded, tax credit timing disputes, and incorrect SCE interconnection forms. Nothing rose to enforcement, and no CSLB discipline appears on any of the three AMECO licenses. But for a company whose complaints cluster around post-sale service, it is telling that no workmanship warranty duration appears anywhere on the fetched site. The residential page claims a 40 year warranty on equipment, which is a manufacturer matter. Get the workmanship term, in years, in the contract, and this company is worth a quote.
The evidence
The 1974 brand start is confirmed by BBB, but the operating entity changed: the current AMECO Solar LLC was incorporated January 24, 2019, licensed May 6, 2019, with BBB dating new ownership to May 6, 2019, while the founder-era corporation dissolved in 2021. The site's own age claims conflict, saying over 50 years in one place and nearly 40 years of solar experience in another.
Source: BBB profile for Ameco Solar LLC
BBB shows an A rating, accreditation since 2000, and 12 complaints in the last three years with 9 closed in the last 12 months, clustered on warranty service delays, project and tax credit timing, and interconnection paperwork; the profile page separately states 11 filed. No CSLB disciplinary disclosure appears on any of the three AMECO licenses, and enforcement searches found nothing.
Solar Power World's 2026 lists place AMECO Solar at rank 227 nationally, rank 49 in California, and rank 74 on the installers list, all at 4,479.97 kW installed in 2025 in residential markets. That is the only independently published volume figure among the three companies in this research batch.
CSLB lists AMECO Solar LLC as current and active under license 1053172, B General Building and C-10 Electrical, issued May 6, 2019 and expiring May 31, 2027, with a $25,000 contractor bond, a $100,000 LLC employee bond, $1,000,000 liability coverage, and workers comp through April 1, 2027. The workers comp policy lists only sales and clerical class codes, and the current license carries no C-46 Solar classification.
Source: CSLB license 1053172
The residential page claims a 40 year warranty on equipment and the site references robust warranties on installation quality, but no workmanship warranty duration appears on any fetched page and the /warranty path returned an error. Given that the BBB complaint pattern centers on warranty service, get the workmanship term in writing before signing.
Source: AMECO residential solar page
Company facts
| CSLB entity | AMECO Solar LLC (DBA), Limited Liability Company, Valley Village CA |
| CSLB license | 1053172, B General Building | C-10 Electrical, current and active; issued May 6, 2019; expires May 31, 2027 |
| Historic license | 483280, AMECO Solar Inc, C-46 Solar, first issued November 26, 1985; reissued to another entity 2009; canceled, corporation dissolved 2021 |
| Bonds | Western Surety contractor bond 65428257, $25,000; Jet Insurance LLC employee bond BX0065948, $100,000 |
| Workers compensation | Great American Alliance, policy WCE82974305, April 1, 2026 to April 1, 2027; class codes are outside sales and clerical only |
| Liability insurance | StarStone National, $1,000,000, through March 1, 2027 |
| Qualifying individuals | Yossi Tamir and Oren Tamir, both also active on NRG Clean Power Inc 1026168 and AMECO Builders Inc 1147847 |
| Founding | Brand since 1974 per BBB; current LLC incorporated January 24, 2019, new ownership May 6, 2019 |
| 2025 installed volume | 4,479.97 kW, Solar Power World 2026 lists |
| Warranty | 40 year equipment claim on residential page; no workmanship duration published |
| Offices | Valley Village (license address), Paramount, and Sacramento, per company site; stated service area is California |
| License number on site | Not found on fetched pages |
Data pulled August 29, 2026 from CSLB license 1053172, CSLB license 483280, BBB profile for Ameco Solar LLC, AMECO Solar and Roofing and Solar Power World 2026 list.
How to read this
This C reflects mixed evidence, not a failing company. The volume is real, the license is clean, and the complaints were answered or resolved. What drags the grade down is the gap between the story and the paperwork: a 1974 brand on a 2019 entity, a service-complaint pattern with no published workmanship warranty behind it, and a comp policy that does not show field crews. Every one of those is a question AMECO can answer in a contract. Make them. Our full rubric, including how our own installation business gets graded on the same scale, is on the methodology page. We are a solar installer and we partner with other solar companies. Grading is structurally separated from revenue; see disclosures.