Skip to content
Solar Learning Lab

Installer profile

Steel City Solar

B
B grade. Ten years on a clean state electrical contractor registration run by a co-founder master electrician, with a BBB A+ and one complaint in three years, but no published workmanship warranty and no independent volume figure.

Get the quote. Steel City Solar LLC is the kind of small Pueblo contractor whose paperwork actually matches its story. Colorado has no solar specific contractor license, so the credential that counts is the electrical contractor registration with the State Electrical Board through DORA. Steel City holds EC.0100798, active, first issued June 6, 2016, current term running to September 30, 2029. The responsible master electrician on that registration, James Devon Brown, ME.0600639, is the same James Brown the about page names as founder, and BBB lists him as an owner alongside co-owner and CFO Tyler Surat. Six registered apprentice electricians sit on the license in an employer relationship, which is the state side signature of a real in house crew, not a sales office that farms out installs. The founding date holds up everywhere we looked: the site says May 2016, BBB records a business start of May 12, 2016, and the state registration followed on June 6, 2016.

The complaint record is short and, on inspection, not really about them. BBB rates the company A+ and has accredited it since September 16, 2019. The live complaints page shows 1 complaint in the last 3 years and 1 closed in the last 12 months. That one complaint, filed December 9, 2025 and answered, was a service call billing dispute from a customer whose system had been installed by a different, now defunct installer; the company response states it did not buy out the contracts of Axco or Big Dog. One caveat: an older index capture of the same page showed 4 complaints in 3 years, so the count has moved between captures. No DORA discipline, no attorney general action, and no lawsuit naming the company turned up.

Two gaps keep this at a B. First, warranty. Nothing we fetched states a workmanship warranty duration. The FAQ points to the 25 year power performance warranty most panel manufacturers offer, and the Tesla page cites the 10 year Powerwall manufacturer warranty. Those cover equipment, not the roof penetrations or the wiring behind your meter. Second, volume. Steel City appears on neither the 2026 Solar Power World national list nor the Colorado list, so its scale rests on company claims and local awards (Best of Pueblo wins documented 2019 through 2024). One timing note: James Brown's own master electrician term shows an expiration of September 30, 2026, days after this data pull. Renewal is routine, but check the record before you sign, and get a workmanship term in writing while you are at it.

The evidence

LongevityVerified

The about page says the company has partnered with Southern Colorado homeowners since 2016, the FAQ dates it to May 2016, BBB records a business start of May 12, 2016, and DORA issued electrical contractor registration EC.0100798 on June 6, 2016. Four sources, one origin, ten years in business per BBB.

Source: Steel City Solar about page

Complaints and enforcementVerified

BBB shows an A+ rating, accreditation since September 16, 2019, 1 complaint in the last 3 years and 1 closed in the last 12 months; the single published complaint (December 9, 2025, answered) concerned a service call on a system installed by a different, defunct company. An older index capture showed 4 complaints in 3 years, so the count has moved. The DORA open data rows for the company and for James Devon Brown carry no discipline case fields, and no attorney general action or lawsuit naming the company was found.

Source: BBB complaints page, Steel City Solar LLC

Verifiable volumePending verification

Steel City Solar appears in neither the 2026 Solar Power World national table (388 entries) nor the 2026 Colorado table (32 entries). The only scale evidence is company published: six consecutive Best of Pueblo wins for 2019 through 2024 and a homepage claim of seven years running. No independent kilowatt or project figure exists for this company.

Source: Solar Power World, 2026 Top Colorado Solar Contractors

License statusVerified

Colorado has no statewide solar contractor license; the verifiable lane is the DORA electrical contractor registration. Steel City Solar LLC holds EC.0100798, Electrical Contractor, active, original issue June 6, 2016, effective October 1, 2026, expiring September 30, 2029, with responsible master electrician James Devon Brown, ME.0600639, in place since May 31, 2016 and six registered apprentices employed under the license. Brown's own master electrician term expires September 30, 2026, so confirm the renewal before contracting past that date.

Source: Colorado DORA license detail, EC.0100798

Warranty termsPending verification

No workmanship warranty duration or scope is published on the homepage, about page, FAQ, Pueblo page, or awards page. The FAQ states that most solar panel manufacturers offer a 25 year power performance warranty and the Tesla page cites the 10 year Powerwall manufacturer warranty; both are equipment warranties held by the manufacturer, not installer coverage. Ask for the workmanship term in writing before signing.

Source: Steel City Solar FAQ

Company facts

DORA registrationSteel City Solar LLC, Electrical Contractor EC.0100798, active; original issue June 6, 2016; effective October 1, 2026; expires September 30, 2029; no discipline case fields
Responsible master electricianJames Devon Brown, ME.0600639, responsible individual since May 31, 2016; ME first issued April 30, 2016, active, current term expires September 30, 2026
Registered apprentices on licenseSix: Alan John Yingling APE.9975144, Cayden Ernesto Rousseau APE.9973054, Dylan Andrew Carpenter APE.9969572, Ivan Andrew Huhtala APE.9978327, Jacob Daniel Moody APE.9964545, Lorenzo Gonzalez APE.9975140
Address49 N Silicon Dr, Pueblo CO 81007-1463
OwnersJames Brown, founder, master electrician and military veteran; Tyler Surat, co-owner and CFO; George Andrews listed by BBB as Business Development Manager
FoundingMay 2016 per the company; BBB business started May 12, 2016; LLC
BBB recordA+, accredited since September 16, 2019; file opened September 11, 2019; 1 complaint in the last 3 years, 1 closed in the last 12 months on the live read
Workmanship warrantyNone published; FAQ cites manufacturer 25 year power performance warranties and the Tesla page cites the 10 year Powerwall manufacturer warranty
Stated service areaPueblo, Pueblo West, Pueblo County, Fremont County, and greater Southern Colorado
Crew claimFAQ says the price is a complete turnkey solution with no subcontractor surprises; the company says it recruits and trains installers and electricians from local high schools
ProductsSolar photovoltaic installation, battery storage, EV charging, and insulation installation per BBB; Tesla Powerwall per the company
AwardsBest of Pueblo solar installer 2019 through 2024 per the company page; homepage claims seven years in a row

Data pulled September 25, 2026 from Colorado DORA license detail, EC.0100798, DORA open data, Steel City Solar query, Steel City Solar BBB profile, Steel City Solar BBB complaints, Steel City Solar about page, Steel City Solar FAQ, Steel City Solar Best of Pueblo page, Solar Power World 2026 national list and Solar Power World 2026 Colorado list.

How to read this

A B here means the state record and the founding story check out and nothing adverse surfaced, while two things a homeowner would want to see in public, a workmanship warranty and an independent volume figure, are simply not published. Neither gap is a warning sign for a ten year old Pueblo shop. Treat the grade as permission to ask sharper questions: what the installer covers after the manufacturer warranty stops, who will be on your roof, and whether the master electrician renewal is done before your contract date. Our full rubric, including how our own installation business gets graded on the same scale, is on the methodology page. We are a solar installer and we partner with other solar companies. Grading is structurally separated from revenue; see disclosures.