Skip to content
Solar Learning Lab
Miniature workers installing a residential solar panel

Photo: Peggy_Marco, via Pixabay

California · Citrus Heights

Citrus Heights solar plays by SMUD rules, not California's usual ones

Written by the Solar Learning Lab research deskUpdated August 28, 202610 min read

Nearly everything written about California solar assumes an investor-owned utility and the CPUC's Net Billing Tariff. Citrus Heights breaks both assumptions. The city sits inside the Sacramento Municipal Utility District, a community-owned utility covering about 900 square miles, and SMUD sets its own solar compensation by board resolution. The CPUC decision that created net billing lists adders for PG&E, SCE, and SDG&E only. None of it reaches a SMUD meter.

The local deal, in three numbers: retail power that averaged 17.87 cents per kWh in 2024, less than half of PG&E's 39.62 in the same EIA table; a flat 9.6 cent credit for every exported kWh effective June 1, 2026; and a $27 monthly fixed charge that no amount of production erases. Cheap power shrinks solar savings. An honest page says so up front, then shows where the value actually hides.

Size it against a SMUD bill

Run the estimator, then apply the discount this page explains. Better to be surprised now than at the first true-up.

Estimate Citrus Heights solar

No PG&E, no CCA, no CPUC tariff. One utility, its own rulebook.

SMUD serves most of Sacramento County plus slivers of Placer and Yolo counties, and Citrus Heights sits entirely inside that footprint. There is no community choice aggregator layered on top and no investor-owned delivery company underneath. SMUD's territory page and its jurisdiction pairing with the city's Building & Safety Division make the arrangement plain: one utility, one city permit office, no middle layer.

The rate design rewards timing. SMUD's standard residential rate, prices as of June 1, 2026, is time-of-day with a weekday 5 to 8 p.m. peak: summer runs 15.5 cents off peak, 21.39 mid peak, and 37.65 at peak, while non-summer spans 12.85 to 17.76 cents, per SMUD's residential rates page. On top sits the System Infrastructure Fixed Charge, $27 a month on the standard rate, $17 on the Fixed Low Use option. That charge arrives whether your roof produced two megawatt-hours or nothing.

About 47 percent of Citrus Heights homes heat with electricity per the ACS figures in our data file, and the local climate piles roughly 73 days above 90 degrees onto air conditioners each year. Both loads land partly in that 5 to 8 p.m. peak window, which is exactly where solar-plus-battery earns its keep and where bare solar, producing hardest at midday, only partly helps.

Every exported kilowatt-hour earns the same 9.6 cents

SMUD's Solar and Storage Rate applies to anyone approved to install solar on or after March 1, 2022, and to anyone who buys a home with existing panels. Exports are credited at one flat rate, all hours, all seasons. That rate rose from 7.4 to 9.6 cents per kWh effective June 1, 2026, adopted by the board on April 27, 2026, and SMUD says it revisits the figure every four years. The utility's own announcement and Rate Schedule SSR are the controlling documents.

Energy sourceTypeAverage priceWhat that means
SMUD summer time-of-dayimport price by period15.5¢ to 37.65¢ per kWhPeak is weekdays 5 to 8 p.m. at 37.65¢; June 1 through September 30.
SMUD non-summer time-of-dayimport price by period12.85¢ to 17.76¢ per kWhThe winter spread is narrow, which mutes load shifting value in cold months.
SMUD export creditSolar and Storage Rate, flat9.6¢ per exported kWhEffective June 1, 2026, up from 7.4¢. Same value at noon and at 6 p.m.
Self-consumed solaravoided retail purchase12.85¢ to 37.65¢ depends on hour and seasonUsing your own production at the 5 to 8 p.m. peak is worth roughly four times exporting it.

SMUD residential rates and Solar and Storage Rate page, August 2026. A snapshot, not a bill simulation.

Read the flat credit for what it is: simple, predictable, and low relative to peak retail. It removes the hourly guessing game that PG&E-territory homeowners face, but it also means oversizing a system to farm export credits is a losing play here. Size to the household's own consumption, and treat exports as spillover, not revenue.

One legacy wrinkle. Homes approved before March 1, 2022 keep old-style net metering through December 31, 2030, but forfeit it early by expanding a system more than 10 percent or 1 kW, or by generating past 110 percent of approved capacity. And a buyer of a solar home lands on the Solar and Storage Rate immediately, whatever the seller enjoyed. SMUD's SSR page lists all three triggers.

One PDF, two letters, three business days

Citrus Heights runs permits through its own Citizen Access Portal, what the CEC's tracking dataset calls a "Custom Platform," with a $60,000 CalAPP award from April 24, 2023 and 2023 data on file. Not instant issuance, but the city commits to processing complete solar submittals within 3 business days per its electronic submittal instructions.

The word doing the work in that sentence is complete. The package must be one single, organized, correctly oriented PDF with plans at 11 by 17 inches, and it must include a SMUD application confirmation letter, proof you have started interconnection with the utility before the city looks at anything. Where an HOA applies, written HOA approval goes in the same PDF. A main panel upgrade needs its own separate electrical permit, and owner-builders using workers must show Workers' Compensation proof.

On the HOA letter, know your rights before you ask permission. Civil Code 714 voids HOA restrictions that would tack on more than $1,000 or drag system efficiency down over 10 percent, requires denials in writing, and deems an application approved if 45 days pass without a written denial. The city wants the letter as an attachment; the HOA does not get a veto.

The price is the pleasant surprise: $228 for a residential PV permit, $296 with an energy storage system, per the Master Fee Schedule effective February 1, 2026, plus a 4 percent technology fee noted on the city's fee page. That is roughly half the $450 state cap in Government Code 66015 and among the cheapest permits we have documented in this region.

The sun is not the problem here

Our PVGIS run models 1,621.4 kWh per year per installed kilowatt at downtown Citrus Heights coordinates, with August peaking at 174.9 kWh per kW and December sagging to 79.4. Roughly 268 sunny days a year will do that. Production in this market is genuinely strong; it is the compensation structure, not the resource, that caps the payoff.

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

August models at 174.9 kWh per kW, more than double December's 79.4. Summer is also when SMUD's 37.65 cent peak makes self-consumption most valuable.

PVGIS v5.2 model run by Solar Learning Lab on August 28, 2026, NSRDB radiation database. Fixed south facing mount, 30 degree tilt, 14 percent losses, downtown Citrus Heights coordinates. Your roof will differ. Full model at PVGIS. Treat the figure as a comparison standard across cities, not as your roof's promise. Orientation, shade, and equipment will move a real system either side of it.

In this market, the battery is not the accessory. It is the strategy.

Follow the spread: exports earn 9.6 cents while peak imports cost 37.65. A battery that shifts midday production into the 5 to 8 p.m. window captures that 28 cent gap every summer weekday. SMUD leans into this with My Energy Optimizer Partner+, which offers up to $10,000 per household for customers who enroll their storage within 90 days of permission to operate. A deadline that tight belongs in the project schedule from day one, not discovered afterward.

The broader incentive picture is thinner than PG&E territory and worth stating plainly. DAC-SASH is off the table because it requires a PG&E, SCE, or SDG&E customer, which Citrus Heights homes are not. The 25D federal homeowner credit ended for installs completed after December 31, 2025, per the CRS summary. SGIP's equity budget frames eligibility by income rather than utility in the CPUC's text, but confirm administrator handling for SMUD customers before counting that money. The property tax exclusion for active solar systems still applies through the 2025 to 2026 fiscal year, sunsetting January 1, 2027.

One more structural note: the city's housing stock includes 1,779 mobile homes per the state E-5 estimates, most of them poor rooftop candidates. If that is your situation, ground rules differ enough that a generic rooftop quote is the wrong starting point entirely.

The installer map centers on Roseville, not Citrus Heights

Our ratings pull found the active companies clustered in Roseville, Fair Oaks, Carmichael, and Orangevale, all a short drive out. Distance matters less than fluency: what you want is a bidder who can describe the Solar and Storage Rate from memory, knows the SMUD confirmation letter comes before the city permit, and builds the 90 day Partner+ enrollment window into the contract timeline. A crew that talks about net metering like it still exists here has not done a SMUD job lately.

California Renewable Energy logo

California Renewable Energy

Roseville, CA

4.9(102 Google reviews)

Cali Solar

Roseville, CA

5.0(21 Google reviews)

Read the graded profile

Solar Electric Pros logo

Solar Electric Pros

Fair Oaks, CA

4.3(12 Google reviews)

Origin Solar USA logo

Origin Solar USA

Carmichael, CA

4.2(43 Google reviews)

Prime Home Solutions

Roseville, CA

4.8(72 Google reviews)

Bear Solar Inc. logo

Bear Solar Inc.

Orangevale, CA

4.2(11 Google reviews)

Ratings snapshot: Google Maps, August 2026, via the DataForSEO SERP feed. Zero companies paid us and none are endorsed by us.

Use this calculator, then discount it

Fair warning: the tool below runs on the California average retail rate, and SMUD's 2024 average was 17.87 cents against a state picture dominated by utilities charging twice that. Its savings figure will overshoot for Citrus Heights. It remains useful for comparing system sizes and payment structures against each other, which is how we suggest you read it.

$161
1,621

The top of the range is our PVGIS run at the Citrus Heights coordinates. The bottom is 85 percent of it, a discount for roofs that face away from due south or pick up afternoon shade.

$2.46

Cash quotes in Citrus Heights cluster near $2.46 per watt, against a $3.50 national 2024 median (LBNL). Use your quote.

Assumptions you can change
2.5%
7%
15
24c

Use the rate on your actual lease or PPA quote. There is no published statewide average we trust enough to hardcode.

2%
Estimated system: 3.6 kWAnnual usage: 5,811 kWhState credit: $0

Cash purchase

$8,856 after state credit

Year 1 benefit
$162/mo
Payback
5 years
20 year net position
$38,242

Warning for Citrus Heights: this tool uses the California average retail rate, but SMUD's 2024 average residential price was 17.87 cents per kWh, less than half of PG&E's. Real SMUD savings will be far smaller than the state rate implies, so cut this number down hard before believing it.

Solar loan

$118/mo 15 yr payment

Year 1 net
$43/mo
Upfront
$0
20 year net position
$25,781

Financed solar has to clear a lower bar here than in PG&E country, because SMUD power is cheap. Get the cash price, the financed price, and the dealer fee on separate lines, then check the monthly payment against a real SMUD bill, not a state average.

Lease / PPA

$0 down you buy the power

Year 1 net
$45/mo
Upfront
$0
20 year net position
$14,736

The 25D homeowner credit ended for installs completed after December 31, 2025. A lease or PPA rate in Citrus Heights competes with SMUD's low retail prices and a flat 9.6 cent export credit, which is a hard fight for third party ownership to win.

Estimates, not quotes. This tool runs on the California average retail rate and our Citrus Heights PVGIS production model, and it cannot reproduce SMUD's Solar and Storage Rate, the flat 9.6 cent export credit, or the $27 monthly fixed charge. We are a solar installer and we also partner with other solar companies. See our disclosures.

We are a solar installer and we also partner with other solar companies.

Citrus Heights solar, asked and answered

Does California's Net Billing Tariff apply to my SMUD account?
No. The NBT comes from CPUC Decision 22-12-056, and its adder tables cover PG&E, SCE, and SDG&E only. SMUD sets solar compensation itself through board-adopted Rate Schedule SSR. SMUD's solar rate page.
What do I earn for exported solar power?
A flat 9.6 cents per kWh for all hours and seasons, effective June 1, 2026, raised from 7.4 cents by an April 2026 board vote. SMUD says it revisits the rate every four years. Announcement.
Can solar eliminate my SMUD bill?
No, and be wary of anyone who claims it. The $27 monthly System Infrastructure Fixed Charge ($17 on Fixed Low Use) applies regardless of production. Rate details.
What has to be in the permit application?
One combined PDF with 11 by 17 plans, a SMUD application confirmation letter, and written HOA approval where applicable. Complete packages process within 3 business days. The PV fee is $228, or $296 with storage, plus a 4 percent technology fee. City instructions.
I have SMUD net metering from before 2022. Do I keep it?
Through December 31, 2030, provided you do not expand the system by more than 10 percent or 1 kW, or exceed 110 percent of approved capacity. Buyers of your home go straight to the Solar and Storage Rate. Terms here.
Is a battery worth it in Citrus Heights?
The rate design argues yes: shifting production from a 9.6 cent export to a 37.65 cent avoided peak purchase is the biggest lever available, and My Energy Optimizer Partner+ pays up to $10,000 for storage enrolled within 90 days of permission to operate. Program details.

Get a Citrus Heights estimate built on SMUD math

Start from your actual SMUD bill and the 5 to 8 p.m. peak, not a statewide average. Then make every proposal show its export assumptions.

What does your monthly electric bill look like?

Citrus Heights average is $161 per month (EIA, 2024).