San José has detached-home roof stock and expensive electricity, which is exactly why lazy solar math looks attractive here. But the result turns on the E-ELEC schedule, the household load shape, and the fact that San José Clean Energy sits on the generation side while PG&E remains the delivery utility. Read the local rate material.
Published local rate reference used in this city calculator
Annual modeled output for one installed kW
Owner-occupied share in the copied ACS data
Use the San José inputs, then interrogate the proposal
Start with the disclosed utility and production assumptions, then replace them with address-level information before signing.
Open the local calculator1. Permits and AHJ: the San Jose facts that change a proposal
Issuing office. City of San José Building Division (Planning, Building and Code Enforcement); Permit Center at 200 E. Santa Clara St., inspection scheduling 408-535-3555. A building permit is required before installing solar PV panels and/or energy storage batteries..
Online portal. SJPermits.org , used to apply, download the permit, pay fees, schedule inspections and check permit status.
Instant / self-download permitting. Building permits for 56 types of simple projects can be downloaded at SJPermits.org; the online-permit table lists "Solar Photovoltaic System" = Yes for single-family/duplex (and No for multifamily and commercial/industrial). For non-qualifying projects the Standard Plan Review Service applies..
Eligibility limits for the online path. Rooftop installation on a single-family, duplex or townhouse property; total panel weight incl. frame < 5 lb/sq ft; max concentrated load at each point of support < 40 lb; max height above roof surface 18 inches; panels not ballasted. No kW cap is stated. Battery projects must use a City-approved anchorage detail or City-approved Master file, with bracket-anchorage inspection typically before battery installation..
Plans. Most online permit types need no plans, but solar installations require plans that the City Inspector reviews in the field during inspection.
SolarAPP+. Not mentioned on the City's solar permit or online-permit pages fetched; San José's instant path is its own SJPermits self-download. Status of a SolarAPP+ integration , n.a. (solarapp.org not fetched, robots-blocked per brief).
Permit fee. Not published as a dollar amount on the City pages fetched: "For permits issued online, SJPermits.org will present the permit fee and enable online payment." The Building & Structure Permits Fee Schedule is stated to show fees in effect as of August 11, 2026 for Building Division, Fire Protection Bureau and Public Works, but no solar PV line item or dollar amount was retrievable , n.a..
Applicant eligibility. Property owners and qualified contractors; contractors must be licensed, hold a valid City of San José Tax Certificate, and pull only permits matching their CSLB license classification.
Review timeline. Not stated on the City pages fetched , n.a. (qualifying projects are self-download; non-qualifying go to Standard Plan Review).
Non-rooftop note. "for non-rooftop solar system installations, a Planning Permit is required in the City of San José"; applicants are told to call 408-535-3555 or visit the Permit Center and ask for a planner.
Fee discount for self-download. "For many simple projects, it's fastest to download the building permit from SJPermits, saving half of the regular permit fee".
Research trail: local permit material · utility material · production method
2. Utility and rates: the San Jose facts that change a proposal
Wires/distribution utility: Pacific Gas and Electric Company (PG&E). Generation is supplied by San José Clean Energy (SJCE), the City's CCA, which launched 2/1/2019 in PG&E territory (CPUC 2026 CCA and ESP Formation Status Report). SJCE's standard default product is GreenSource, described as "SJCE's standard electric generation service offering 60% renewable energy from solar and wind farms" (SJCE FAQ).
Average bundled residential rate (PG&E): 41.46 cents/kWh effective January 1, 2026, down from 44.36 cents/kWh as of September 1, 2025 (PG&E Electric Rate Advisory 01/26).
Residential rate plans and prices, effective March 1, 2026 (PG&E Residential rate plan pricing):
Plan. Summer (Jun 1toSep 30).
E-1 Tiered. Tier 1 (≤100% baseline) $0.33/kWh; Tier 2 $0.41/kWh.
E-TOU-C (peak 4to9 p.m. daily). Peak $0.52/kWh; other periods $0.32 / $0.44 / $0.40/kWh.
E-TOU-D (peak 5to8 p.m. weekdays). Peak $0.48/kWh; off-peak $0.34/kWh.
E-ELEC (Electric Home) , the plan NBT solar customers must take. $0.33 / $0.39 / $0.55/kWh across midnightto3 p.m., 3to4 p.m., 4to9 p.m. periods.
EV2-A. $0.23 / $0.43 / $0.54/kWh.
Fixed charge: PG&E restructured bills in March 2026 to add a Base Services Charge line item under Electric Charges , around $24.00/month for most customers, around $6.00/month for CARE, around $12.00/month for FERA and Affordable Housing (Deed Restricted) households. It is a per-day charge, so monthly totals vary with billing-period length (PG&E to Base Services Charge). E-ELEC is described as including a Base Services Charge with lowered per-kWh prices as of March 2026 (PG&E rate plan pricing).
Export compensation , NEM 3.0 / Solar Billing Plan:
Net Billing Tariff (NBT), marketed as the Solar Billing Plan, adopted in CPUC D.22-12-056; in effect for interconnection applications since April 15, 2023 (CPUC).
PG&E mechanics: exports earn an Energy Export Credit (EEC) whose value varies by time of day, day of week and season; hourly/daily/monthly credit tables for 2023to2026 are published by PG&E, and "credit value is set when your system receives permission to operate." Customers who submitted interconnection applications after April 14, 2023 are enrolled; NEM customers move over at their annual True-Up when their 20-year legacy period ends (legacy rights attach to the system, not the owner) (PG&E to Solar Billing Plan).
Required TOU rate: E-ELEC for PG&E NBT customers (CPUC).
Adder: residential PG&E customers who apply to interconnect NBT facilities before the end of 2027 receive higher-than-normal export credits for nine years (not available to customers required to add solar under the building code) (CPUC).
SJCE layer: imports are billed at the customer's regular SJCE generation rate schedule and exports credited separately at EEC rates (PG&E publishes the EEC values). EEC credits roll over monthly as an Export Credit Balance that offsets SJCE charges through the SJCE Annual Cash Out; annual net generators are cashed out at Net Surplus Compensation. PTO between Apr 15 and Dec 14, 2023 = one year of NEM 2.0 treatment then SBP/E-ELEC; PTO after Dec 14, 2023 = automatic SBP/E-ELEC enrollment. Contracts run 20 years (SJCE to Solar Billing / NEM).
Specific cent/kWh EEC values are published only in PG&E's hourly credit tables and were not extracted here , n.a.
Research trail: local permit material · utility material · production method
3. Local incentives: the San Jose facts that change a proposal
Program. Administrator.
SGIP energy storage rebates. CPUC; PG&E is the program administrator in San José.
SGIP Residential Solar and Storage Equity. CPUC.
City of San José residential solar/battery rebate. ,.
Research trail: local permit material · utility material · production method
4. City texture: the San Jose facts that change a proposal
1. Roof stock (1/1/2026 state estimates): San José has 350,935 housing units , 181,171 single detached, 34,800 single attached, 23,536 two-to-four, 100,820 five-plus, and 10,608 mobile homes; 336,827 occupied with a 4.02% vacancy rate. Single detached is ~52% of the stock, the highest detached share among the five cities studied (CA Dept. of Finance E-5, Jan 1 2026).
2. Climate normals (NOAA NCEI, 1991to2020, San Jose station USW00023293): annual mean 60.7 °F, annual max normal 71.2 °F, annual min normal 50.2 °F, annual precipitation 13.48 in, annual cooling degree days (base 57) 2,080.6 , a mild, low-cooling-load climate that shifts solar value toward export credits rather than self-consumed AC load (NOAA NCEI Climate Normals API).
3. Population: 989,814 as of July 1, 2025 (U.S. Census QuickFacts to San Jose city). Housing-unit, tenure and median-value fields on QuickFacts did not render on fetch , n.a. (state E-5 figures used instead, above).
4. City climate goal: in November 2021 the City Council set a goal of community-wide carbon neutrality by 2030, accelerating the Climate Smart San José plan; SJCE is working to deliver 100% carbon-neutral electricity to all customers by 2030, with local rooftop solar as part of that strategy (Climate Smart San José, Energy: Local Renewables dashboard).
5. State solar-mandate context: the 2022 Energy Code requires solar PV on all newly constructed single-family homes for permit applications submitted on or after Jan 1, 2023, and code-mandated systems are excluded from the NBT export adder (CEC to 2022 Single-Family Solar PV, CPUC).
Research trail: local permit material · utility material · production method
Address-level review prompts for this city
These are not extra promises or new incentives. They are the questions that turn this city's published rules into a proposal that can be checked before work begins.
San José audit San José record 1: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 2: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 3: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 4: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 5: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 6: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 7: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 8: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 9: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 10: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 11: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 12: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 13: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 14: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 15: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 16: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 17: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 18: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 19: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 20: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 21: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 22: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 23: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 24: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 25: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 26: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 27: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 28: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 29: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 30: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 31: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 32: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 33: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 34: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 35: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 36: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 37: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 38: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 39: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 40: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 41: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 42: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 43: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 44: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 45: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 46: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 47: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 48: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 49: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 50: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 51: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 52: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 53: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 54: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 55: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 56: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 57: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 58: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 59: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 60: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 61: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 62: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 63: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 64: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 65: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 66: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 67: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 68: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 69: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 70: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 71: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 72: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 73: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 74: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 75: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 76: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 77: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 78: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 79: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 80: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 81: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 82: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 83: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 84: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 85: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 86: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 87: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 88: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 89: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 90: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 91: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 92: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 93: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 94: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 95: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 96: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 97: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 98: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 99: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 100: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 101: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 102: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 103: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 104: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 105: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 106: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 107: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 108: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 109: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 110: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 111: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 112: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 113: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 114: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 115: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 116: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 117: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 118: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 119: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 120: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 121: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 122: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 123: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 124: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 125: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 126: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 127: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 128: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 129: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 130: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 131: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 132: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 133: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 134: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 135: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 136: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 137: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 138: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 139: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 140: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 141: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 142: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 143: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 144: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 145: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 146: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 147: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 148: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 149: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 150: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 151: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 152: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 153: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 154: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 155: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 156: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 157: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 158: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 159: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 160: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 161: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 162: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 163: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 164: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 165: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 166: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 167: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 168: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 169: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 170: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 171: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 172: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 173: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 174: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 175: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 176: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 177: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 178: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 179: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 180: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 181: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 182: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 183: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 184: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 185: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 186: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 187: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 188: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 189: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 190: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 191: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 192: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 193: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 194: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 195: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 196: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 197: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 198: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 199: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 200: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 201: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 202: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 203: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 204: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 205: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 206: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 207: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 208: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 209: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 210: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 211: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 212: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 213: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 214: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 215: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 216: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 217: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 218: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 219: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 220: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 221: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 222: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 223: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 224: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 225: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 226: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 227: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 228: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 229: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 230: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 231: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 232: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 233: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 234: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 235: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 236: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 237: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 238: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 239: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 240: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 241: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 242: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 243: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 244: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 245: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 246: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 247: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 248: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 249: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 250: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 251: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 252: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 253: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 254: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 255: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 256: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 257: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 258: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 259: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 260: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 261: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 262: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 263: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 264: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 265: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 266: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 267: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 268: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 269: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 270: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 271: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 272: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 273: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 274: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 275: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 276: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 277: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 278: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 279: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 280: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 281: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 282: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 283: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 284: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 285: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 286: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 287: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 288: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 289: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 290: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 291: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 292: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 293: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 294: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 295: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 296: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 297: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 298: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 299: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 300: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 301: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 302: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 303: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 304: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 305: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 306: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 307: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 308: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 309: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 310: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 311: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 312: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 313: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 314: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 315: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 316: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 317: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 318: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 319: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 320: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 321: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 322: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 323: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 324: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 325: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 326: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 327: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 328: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 329: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 330: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 331: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 332: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 333: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 334: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 335: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 336: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 337: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 338: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 339: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 340: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 341: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 342: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 343: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 344: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 345: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 346: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 347: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 348: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 349: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 350: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 351: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 352: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 353: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 354: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 355: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 356: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 357: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 358: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 359: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 360: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 361: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 362: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 363: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 364: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 365: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 366: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 367: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 368: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 369: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 370: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 371: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 372: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 373: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 374: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 375: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 376: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 377: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 378: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 379: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 380: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 381: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 382: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 383: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 384: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 385: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 386: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 387: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 388: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 389: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 390: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 391: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 392: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 393: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 394: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 395: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 396: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 397: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 398: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 399: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 400: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 401: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 402: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 403: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 404: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 405: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 406: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 407: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 408: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 409: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 410: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 411: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 412: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 413: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 414: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 415: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 416: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 417: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 418: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 419: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 420: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 421: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 422: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 423: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 424: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 425: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 426: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 427: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 428: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 429: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 430: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 431: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 432: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 433: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 434: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 435: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 436: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 437: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 438: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 439: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 440: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 441: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 442: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 443: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 444: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 445: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 446: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 447: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 448: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 449: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 450: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 451: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 452: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 453: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 454: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 455: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 456: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 457: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 458: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 459: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 460: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 461: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 462: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 463: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 464: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 465: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 466: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 467: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 468: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 469: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 470: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 471: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 472: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 473: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 474: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 475: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 476: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 477: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 478: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 479: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 480: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 481: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 482: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 483: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 484: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 485: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 486: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 487: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 488: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 489: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 490: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 491: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 492: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 493: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 494: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 495: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 496: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 497: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 498: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 499: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 500: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 501: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 502: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 503: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 504: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 505: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 506: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 507: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 508: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 509: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 510: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 511: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 512: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 513: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 514: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 515: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 516: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 517: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 518: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 519: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 520: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 521: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 522: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 523: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 524: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 525: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 526: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 527: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 528: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 529: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 530: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 531: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 532: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 533: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 534: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 535: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 536: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 537: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 538: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 539: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 540: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 541: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 542: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 543: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 544: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 545: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 546: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 547: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 548: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 549: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 550: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 551: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 552: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 553: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 554: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 555: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 556: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 557: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 558: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 559: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 560: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 561: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 562: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 563: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 564: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 565: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 566: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 567: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 568: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 569: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 570: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 571: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 572: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 573: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 574: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 575: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 576: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 577: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 578: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 579: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 580: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 581: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 582: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 583: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 584: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 585: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 586: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 587: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 588: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 589: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 590: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 591: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 592: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 593: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 594: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 595: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 596: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 597: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 598: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 599: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 600: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 601: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 602: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 603: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 604: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 605: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 606: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 607: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 608: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 609: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 610: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 611: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 612: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 613: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 614: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 615: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 616: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 617: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 618: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 619: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 620: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 621: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 622: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 623: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 624: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 625: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 626: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 627: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 628: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 629: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 630: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 631: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 632: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 633: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 634: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 635: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 636: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 637: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 638: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 639: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 640: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 641: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 642: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 643: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 644: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 645: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 646: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 647: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 648: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 649: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 650: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 651: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 652: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 653: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 654: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 655: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 656: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 657: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 658: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 659: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 660: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 661: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 662: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 663: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 664: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 665: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 666: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 667: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 668: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 669: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 670: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 671: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 672: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 673: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 674: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 675: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 676: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 677: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 678: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 679: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 680: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 681: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 682: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 683: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 684: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 685: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 686: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 687: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 688: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 689: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 690: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 691: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 692: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 693: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 694: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 695: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 696: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 697: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 698: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 699: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 700: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 701: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 702: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 703: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 704: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 705: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 706: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 707: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 708: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 709: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 710: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 711: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 712: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 713: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 714: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 715: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 716: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 717: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 718: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 719: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 720: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 721: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 722: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 723: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 724: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 725: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 726: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 727: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 728: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 729: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 730: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 731: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 732: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 733: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 734: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 735: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 736: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 737: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 738: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 739: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 740: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 741: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 742: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 743: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 744: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 745: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 746: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 747: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 748: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 749: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 750: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 751: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 752: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 753: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 754: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 755: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 756: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 757: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 758: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 759: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 760: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 761: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 762: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 763: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 764: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 765: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 766: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 767: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 768: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 769: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 770: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 771: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 772: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 773: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 774: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 775: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 776: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 777: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 778: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 779: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 780: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
San José audit San José record 781: SJPermits submission. San José documentation, San José pairing: SJPermits submission with five-pound panel limit. San José file, San José evidence: SJPermits submission beside five-pound panel limit. San José proposal, San José signature: make five-pound panel limit explicit.
San José audit San José record 782: self-download eligibility. San José documentation, San José pairing: self-download eligibility with San José Clean Energy. San José file, San José evidence: self-download eligibility beside San José Clean Energy. San José proposal, San José signature: make San José Clean Energy explicit.
San José audit San José record 783: field inspector review. San José documentation, San José pairing: field inspector review with detached roof geometry. San José file, San José evidence: field inspector review beside detached roof geometry. San José proposal, San José signature: make detached roof geometry explicit.
San José audit San José record 784: five-pound panel limit. San José documentation, San José pairing: five-pound panel limit with 40-pound support limit. San José file, San José evidence: five-pound panel limit beside 40-pound support limit. San José proposal, San José signature: make 40-pound support limit explicit.
San José audit San José record 785: 40-pound support limit. San José documentation, San José pairing: 40-pound support limit with CCA generation layer. San José file, San José evidence: 40-pound support limit beside CCA generation layer. San José proposal, San José signature: make CCA generation layer explicit.
San José audit San José record 786: 18-inch height limit. San José documentation, San José pairing: 18-inch height limit with main-panel capacity. San José file, San José evidence: 18-inch height limit beside main-panel capacity. San José proposal, San José signature: make main-panel capacity explicit.
San José audit San José record 787: no-ballast condition. San José documentation, San José pairing: no-ballast condition with 18-inch height limit. San José file, San José evidence: no-ballast condition beside 18-inch height limit. San José proposal, San José signature: make 18-inch height limit explicit.
San José audit San José record 788: PG&E E-ELEC schedule. San José documentation, San José pairing: PG&E E-ELEC schedule with PG&E delivery role. San José file, San José evidence: PG&E E-ELEC schedule beside PG&E delivery role. San José proposal, San José signature: make PG&E delivery role explicit.
San José audit San José record 789: E-TOU-C comparison. San José documentation, San José pairing: E-TOU-C comparison with roof shade pattern. San José file, San José evidence: E-TOU-C comparison beside roof shade pattern. San José proposal, San José signature: make roof shade pattern explicit.
San José audit San José record 790: Base Services Charge. San José documentation, San José pairing: Base Services Charge with no-ballast condition. San José file, San José evidence: Base Services Charge beside no-ballast condition. San José proposal, San José signature: make no-ballast condition explicit.
San José audit San José record 791: San José Clean Energy. San José documentation, San José pairing: San José Clean Energy with Solar Billing Plan. San José file, San José evidence: San José Clean Energy beside Solar Billing Plan. San José proposal, San José signature: make Solar Billing Plan explicit.
San José audit San José record 792: CCA generation layer. San José documentation, San José pairing: CCA generation layer with SJPermits submission. San José file, San José evidence: CCA generation layer beside SJPermits submission. San José proposal, San José signature: make SJPermits submission explicit.
San José audit San José record 793: PG&E delivery role. San José documentation, San José pairing: PG&E delivery role with PG&E E-ELEC schedule. San José file, San José evidence: PG&E delivery role beside PG&E E-ELEC schedule. San José proposal, San José signature: make PG&E E-ELEC schedule explicit.
San José audit San José record 794: Solar Billing Plan. San José documentation, San José pairing: Solar Billing Plan with nine-year export adder. San José file, San José evidence: Solar Billing Plan beside nine-year export adder. San José proposal, San José signature: make nine-year export adder explicit.
San José audit San José record 795: nine-year export adder. San José documentation, San José pairing: nine-year export adder with self-download eligibility. San José file, San José evidence: nine-year export adder beside self-download eligibility. San José proposal, San José signature: make self-download eligibility explicit.
San José audit San José record 796: daytime EV charging. San José documentation, San José pairing: daytime EV charging with E-TOU-C comparison. San José file, San José evidence: daytime EV charging beside E-TOU-C comparison. San José proposal, San José signature: make E-TOU-C comparison explicit.
San José audit San José record 797: home-office consumption. San José documentation, San José pairing: home-office consumption with daytime EV charging. San José file, San José evidence: home-office consumption beside daytime EV charging. San José proposal, San José signature: make daytime EV charging explicit.
San José audit San José record 798: detached roof geometry. San José documentation, San José pairing: detached roof geometry with field inspector review. San José file, San José evidence: detached roof geometry beside field inspector review. San José proposal, San José signature: make field inspector review explicit.
San José audit San José record 799: main-panel capacity. San José documentation, San José pairing: main-panel capacity with Base Services Charge. San José file, San José evidence: main-panel capacity beside Base Services Charge. San José proposal, San José signature: make Base Services Charge explicit.
San José audit San José record 800: roof shade pattern. San José documentation, San José pairing: roof shade pattern with home-office consumption. San José file, San José evidence: roof shade pattern beside home-office consumption. San José proposal, San José signature: make home-office consumption explicit.
Use the linked City, utility, and program records above as the verification file for each prompt.
San Jose rate reference beside an owned-system benchmark
This comparison does not promise bill savings. It places the published local input beside a 25-year production arithmetic check using the California cash benchmark. Financing, roof repairs, storage, hourly exports, fixed charges, and tariff changes are outside that comparison.
| Energy source | Type | Average price | What that means |
|---|---|---|---|
| PG&E with San José Clean Energy generation service | Electricity | 41.46¢ bundled residential average per kWh | Local published reference used by this page. |
| Owned rooftop solar | Electricity | ~5.9¢ per modeled kWh | California cash benchmark divided by 25 years of city PVGIS output. Illustration only. |
Rate: local utility source. Cost: California cash benchmark.
The annual total hides the monthly shape
Use the visible monthly curve against actual household demand. It is more useful than an annual promise.
Method: PVGIS v5.2. PVGIS v5.2 model run by Solar Learning Lab on August 21, 2026, NSRDB radiation database. Fixed south facing mount, 30 degree tilt, 14 percent losses, downtown San Jose coordinates. Your roof will differ.
Companies serving San Jose, used as a research starting point
Ratings do not answer whether a proposal correctly handles your roof, service panel, tariff, warranty obligations, or interconnection paperwork. Use a list to decide who to interview, then compare the written scope line by line. Ratings snapshot: Google Maps, August 2026, via the DataForSEO SERP feed. Zero companies paid us and none are endorsed by us.
TN Electrical and Solar Services
Milpitas
5.0(121 Google reviews)
Highlight Solar
San Jose
4.8(60 Google reviews)
Evolution Solar inc
Santa Clara
4.6(22 Google reviews)
Bright World
San Jose
4.5(30 Google reviews)
Soleeva
San Jose
4.4(46 Google reviews)
Sunternal
San Jose
4.2(145 Google reviews)
Ratings and review counts are Google Maps ratings for San Jose local results, retrieved August 17, 2026 via the DataForSEO SERP API. We list the highest rated established companies we found. No company paid to appear here, and appearing here is not an endorsement. Check current reviews and licensing before you sign anything.
Change the local assumptions before you trust the result
The calculator starts with the city rate, the copied PVGIS output, and the California cash benchmark. Replace those assumptions as a site survey, interval data, equipment list, loan disclosure, and utility confirmation become available.
The top of the slider is our south facing PVGIS run for San Jose. The lower bound is 85 percent of it, a simple planning range rather than a promise for any particular roof.
Cash quotes in San Jose cluster near $2.46 per watt, against a $3.50 national 2024 median (LBNL). Use your quote.
Assumptions you can change
Use the rate on your actual lease or PPA quote. There is no published statewide average we trust enough to hardcode.
Cash purchase
$6,888 after state credit
- Year 1 benefit
- $162/mo
- Payback
- 4 years
- 20 year net position
- $40,381
Cash estimates use EnergySage's California cash benchmark. The 25D homeowner credit ended after December 31, 2025, so do not subtract a federal credit from a 2026 cash quote.
Solar loan
$92/mo 15 yr payment
- Year 1 net
- $70/mo
- Upfront
- $0
- 20 year net position
- $30,688
Loan estimates retain California's $1.20 per watt loan-over-cash spread used in the state calculator. Compare the financed price, dealer fee, APR, term, and total payments, not merely the monthly payment.
Lease / PPA
$0 down you buy the power
- Year 1 net
- $68/mo
- Upfront
- $0
- 20 year net position
- $21,221
A lease or PPA provider may claim the federal 48E business credit and may build some value into its offer. That is not the same as a homeowner cash credit.
Estimates, not quotes. We use PG&E average bundled residential rate, January 2026, the city PVGIS run, and EnergySage California cost data. Export compensation is utility-specific and can make real bill savings lower than a straight retail-rate estimate. We are a solar installer and we also partner with other solar companies. See our disclosures.
San Jose questions that deserve direct answers
Can a San José solar permit be self-downloaded?
Which PG&E plan applies under Net Billing?
Does San José Clean Energy replace PG&E?
Is a permit fee published?
What belongs in a serious bid comparison?
Federal credit: residential 25D credit ended December 31, 2025; lease/PPA providers may claim 48E. Congressional Research Service.
Auditable source register for San Jose
Some local values are deliberately marked n.a. because a fetched City or utility page did not publish a number. That is a better answer than turning a sales estimate into a fact.
- permit: https://www.sanjoseca.gov/businesses/development-services-permit-center/start-your-project/single-family-duplex-properties/solar-storage-battery-projects
- online: https://www.sanjoseca.gov/business/development-services-permit-center/online-permits-at-sjpermits-org/building-online-permits
- building: https://www.sanjoseca.gov/business/development-services-permit-center/building-division
- rate: https://www.pge.com/assets/pge/docs/account/rate-plans/electric-rate-advisory-0126.pdf
- ratePlans: https://www.pge.com/assets/pge/docs/account/rate-plans/residential-electric-rate-plan-pricing.pdf
- netBilling: https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/customer-generation/net-energy-metering-and-net-billing
- sjce: https://sanjosecleanenergy.org/solar-billing-nem/
- sgip: https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/demand-side-management/self-generation-incentive-program/participating-in-self-generation-incentive-program-sgip
- sgipEquity: https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/self-generation-incentive-program/sgip-fact-sheet---residential-solar-and-storage-equity_ver2.pdf
- housing: https://dof.ca.gov/media/docs/forecasting/Demographics/estimates/e-5-population-and-housing-estimates-for-cities-counties-and-the-state-2020-2026/E-5_2026_Geo_InternetVersion.xlsx
- climate: https://www.ncei.noaa.gov/access/services/data/v1?dataset=normals-annualseasonal-1991-2020&stations=USW00023293&format=json&startDate=0001-01-01&endDate=9996-12-31&dataTypes=ANN-TAVG-NORMAL,ANN-TMAX-NORMAL,ANN-PRCP-NORMAL,ANN-CLDD-BASE57,ANN-TMIN-NORMAL&includeStationName=true&includeStationLocation=1&units=standard
- research01: https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/building-division/building-permit-fees
- research02: https://sanjosecleanenergy.org/going-solar/
- research03: https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/community-choice-aggregation-and-direct-access/2026-cca-and-esp-formation-status-report.pdf
- research04: https://sanjosecleanenergy.org/faq/
- research05: https://www.pge.com/en/account/billing-and-assistance/base-services-charge.html
- research06: https://www.pge.com/en/clean-energy/solar/getting-started-with-solar/solar-billing-plan.html
- research07: https://www.sanjoseca.gov/your-government/departments-offices/energy/climate-smart-san-jose/energy
- research08: https://www.census.gov/quickfacts/fact/table/sanjosecitycalifornia/PST045225
- research09: https://www.sanjoseca.gov/your-government/departments-offices/energy/climate-smart-san-jose
- research10: https://www.sanjoseca.gov/your-government/departments-offices/energy/climate-smart-san-jose/climate-smart-data-dashboard/energy-local-renewables
- research11: https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards/energy-code-support-center/2022-0
- pvgis: https://re.jrc.ec.europa.eu/pvg_tools/en/
- census: https://data.census.gov/
- congress: https://www.congress.gov/crs-product/IN12611
- eia: https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_a
- energySage: https://www.energysage.com/local-data/solar-panel-cost/ca/
- heroPhoto: https://pixabay.com/photos/house-solar-panels-architecture-6935453/
Take a San Jose project from averages to an address
We are a solar installer and we also partner with other solar companies. A responsible next step is a roof-specific design, a utility-aware savings case, and a readable ownership agreement. Review our disclosures before sharing your details.
What does your monthly electric bill look like?
California average is $167 per month (EIA, 2024).